Official opening of the new factory for production of Actoverco solid drugs (Actoverco 2)
According to PHANA, the official opening and operation ceremony of the new Actoverco solid drug production factory was held in Baharestan Industrial Town.
According to PHANA, the official opening and operation ceremony of the new Actoverco solid drug production factory (Actoverco 2) was held in Baharestan Industrial Town.
According to PHANA, it is worth mentioning that this ceremony was supposed to be held on February 5, but it was canceled for unknown reasons.
Prominent features of this project:
- More than 10000 m2 of infrastructure
- 4200 m2 of clean rooms and includes 3 granulation lines, 6 tablet and capsule production lines and 5 high-speed packing lines.
- Construction with the participation of German Merck company
- Annual production capacity of 6 billion tablets and capsules
- aimed to meet the needs of the Iranian and regional market
- Completely closed and controlled system of material transfer and production
- Control of all environmental parameters such as pressure difference, temperature and… with advanced equipment and modern systems of the world
- Equipped with the newest and fastest tablet pressing and packaging machines
- Beginning of pilot production from the end of 2018 and launch its products to the market soon
Reference: PHANA